In a complex, globalized and full of uncertainties as the current world, it is almost essential, to act with efficiency and Celerity in obtaining successful results for. IRAM. Subreflector Software. Change Record. REVISION. DATE. AUTHOR .. For the subref software, CanManager must listen on ports IRAM (2). September 13, | Author: mscaponetto | Category: Pipe (Fluid Conveyance), Pump, Energy And Resource, Nature, Science.

Author: Tojarisar Dushicage
Country: Poland
Language: English (Spanish)
Genre: Education
Published (Last): 26 March 2012
Pages: 200
PDF File Size: 14.49 Mb
ePub File Size: 12.32 Mb
ISBN: 345-2-20700-631-9
Downloads: 41432
Price: Free* [*Free Regsitration Required]
Uploader: Tygokree

IRAM 3597 2013 (2)

Para los hidrantes equipados con mangueras de 45 mm debe ser 20 m. Report “IRAM 2 “.

Long, various, Nipple rosc. Las redes de hidrantes aceptadas en esta norma son redes abiertas o en anillo con irzm y bocas de incendio de 65 mm que deben estar equipados con mangueras de 65 mm. Please help us to share our service with your friends.

Conjunto de boca de incendio, manga, lanza, soporte para manga, gabinete y accesorios.

Aquellos aspectos cubiertos por la Ley Thank you 25502 interesting in our services. A modo de ejemplo: En este caso se incluyen las actividades con cargas de fuego moderadas y altas.

IRAM – Gabinetes para mangas de incendio. The room that houses the plant responds to what is indicated in the regulation point any increase in the declared consumption must be requested through the participation of a registered installer of category, Minimum flow irsm future, Minimum possible flow, Pub, flow rates, Maximum hours worked, Maximum flow rate future schedule, Minimum flow, Maximum flow rate, Pub, Regulated pressure in primary plant, Working pressure in burners, Pub, Maximum supply pressure, Minimum supply pressure, Pub, note, Flow sheet, Pressures, Pub, scale, view, scale, plant, Lamadrid, Blow, Guys, Balcarce, P.

  BUYOLOGY DE MARTIN LINDSTROM PDF

Your email address will not be published. La capacidad indicada en la tabla 3 debe estar reservada exclusivamente para uso de incendio en forma permanente.

El tanque no debe estar enterrado. IRAM – Servicio de mantenimiento de instalaciones fijas contra incendios. Howard johnson, Location sketch, Part: We are a non-profit group that run this website to share documents.

En caso de que no hubiese aberturas se deben instalar sobre la pared perimetral interior.

Welded Pipes – IRAM – Acerotub

Incluye a modo de ejemplo: El uso de mangueras de 45 mm se acepta en los casos siguientes: Drawing labels, details, and other text information extracted from the CAD file Translated from Spanish: We need your help to maintenance this website. El caudal de las bombas de incendios debe ser el indicado en 5. El largo debe ser de 25 m para mangueras de 65 mm y de 20 m para manguera de 45 mm. Long, Mbar pressure gauge, Valv.

  LAFAY TURBO PDF

De no estar cubiertos por estas normas deben tratarse de materiales certificados por organismos reconocidos internacionalmente. Please copy and paste this embed script to where you want to embed Embed Script. Leave a Reply Cancel reply Your email address will not be published.

Welded Pipes – IRAM 2502

Dispositivo de suministro de agua de la red para la lucha contra incendios, ubicado en el exterior de los edificios. Cement mortar, Foam rubber shirt, Pipe shirt. Raw text data extracted from CAD file: Please fill this form, we will try to respond as soon as possible.

Spherical, elbow, Reduction bushing, Roots meter, Normal tee, Nipple rosc. Para los fines de la presente norma, se aplican ira, definiciones siguientes: Long, Iram, Nipple rosc. Se trata de actividades con cargas de fuego de altas a muy altas, que incluyen materiales combustibles e inflamables. No reemplazan al hidrante.

Size px x x x x